A sub-contractor could not get the 40ft long LV20n at Corner B to work. The sub-Contractor felt LV20n did not have enough swing angle to turn the corner. JD Fields showed up to help engineer a solution.
Seaboard Power Management contacted us saying they needed a large assortment of materials delivered within three weeks. Everything was sourced on the ground except the DZ80 sheet piles. All material was delivered to Port of Miami on or before the required date.
JD Fields was able to provide same-day order and pick up for an additional 40’ hot rolled sheet pile to assist in a canal diversion project when the water flow/levels increased dangerously.
Light rail extension.